Investor: Serbian Railway Infrastructure
Contractor: Consortium Karin komerc MD d.o.o. - RZD International L.L.C.
Expert supervision: Consortium Project biro UTIBER d.o.o. - UTIBER Közúti Beruházó Kft. – Građevinski institut Centralna putna laboratorija d.o.o. - CEE CORPORATION d.o.o. - Slaviša Ilić PR SDC PROFESSIONAL
The length of the railway track Subotica (freight) – Horgoš – state border with Hungary is 27.90 km – from km 1+269.84 (end of exit switch No.12a at Subotica Freight Station) to km 27+897.04 (state border). The project aims to achieve a technical level and traffic quality according to the requirements of modern traffic systems, including:
Increased train speed;
Increased axle load of track;
Increased train length;
Increased track capacity;
Improved railway safety;
Reduced travel time and energy consumption;
Minimized adverse environmental impacts;
The project also includes reconstruction and construction of various structures, canopies, underpasses, culverts, and noise protection walls at stations Palić, Bački Vinogradi, Horgoš, and Hajdukovo.